Before & After
3 Bedrooms | 4 Bathrooms | 2,221 SF
Sold for $1,570,000 | 15 Days on the Market
ESTIMATES
Cleaner
-
Christian Lopez
-
Total: $475.00
-
Paint
-
Steve Paik
-
Total: $4,900.00
-
Staging
-
First Impression Design - Jodi Bader
-
Cost: $7,200.00 for first 90 days/$1,800.00 each month after.
-
Includes Full interior + Exterior
-
-
Tao Staging - Vicky Wang
-
Cost: $5,300.00 for Interior only for first 90 Days/$1,300.00-$,1450.00/each month after (depending on if you add exterior).
-
Option to add outdoor sofa set $600.00 or two chairs with side table $200.00/set.
-
Handyman
-
Wilfer Vargas
-
Total: $9,800.00
-
Painting the all unit
-
Including patch all the holes little cracks.
-
Paint walls, doors base moldings, laundry bathrooms, closets always downstairs bedrooms ceilings and put kill primer for stain on ceiling have copper stain
-
Paint all the walls in ceilings flat finish
-
Doors base moldings bathrooms and laundry semi gloss
-
Use same color is now do color, match, labor, and material, including
-
All the paint is from Dunn Edward Paint
-
Water base
-
Total labor and material
-
-